ASBATANKVOY -- PART CARGO -- TANKERMEN -- BARGE -- CARGO -- TERMINAL -- PIPELINE -- ARBITRATION -- CONTAMINATION -- Charterer Award
The Vessel was to be loaded with three separate part cargoes, however the tankermen failed to switch the barge tanks in time to accommodate the cargo changeover in the terminal’s pipeline. The Owner began arbitration to recover damages from the resulting cargo mixing and contamination.