TIME CHARTER -- GROUNDING DUE EXCESS DRAFT RESULTING FROM SUB-CHARTERER’S LOAD INSTRUCTIONS -- Charterer Award
Under a chain of time charters, the Vessel grounded and damaged her hull as a result of following the sub-Charterer’s load instructions to a draft of 13.3m. The Head Owner’s claim for indemnity failed because the sub-Charterer’s indemnity guarantee was given to the Master as the representative of the intermediate Charterer (not as a representative of the Head Owner) and the indemnity was not provided on a back-to-back basis throughout the chain.